The perfect laboratory probably only exists in theory. The most meticulously-designed lab space, outfitted without sparing expense, will be ideal only until needs change, focus shifts, or growth is required. That's why lab planners are abandoning perfection for flexibility, and the form that flexibility takes is often modular. Modular labs can be whole buildings or rooms fabricated off-site and installed to spec, or they can be labs within a solid structure that have been designed with modular concepts to allow for future reconfiguration.
Tags: New research facilities, new science wet labs, San Diego, laboratory, San Diego Biotechnology
Acquiring the 28-building, 2.1 million sf former Pfizer complex on the north side of its Ann Arbor campus, renamed the North Campus Research Complex (NCRC), was a coup for the University of Michigan in 2009. (Read our earlier blog on the NCRC.) While some labs were filled quickly, planning, retrofitting, and moving into that much space doesn't happen overnight, so administrators developed a master plan for occupancy. That timeline has the complex reaching capacity by the end of this year, 2012, and they are ahead of schedule.
Tags: University of Michigan, Midwest, New research facilities, new science wet labs, 2012, Ann Arbor, BioResearch Product Faire Event, MI, UMich
Following up on our much-read April 2011 blog on Biomedical Building News at UCSD, we are pleased to report that the following UCSD medical facilities have celebrated their grand openings:
Tags: CA, biomedical research, Stem cell research, New research facilities, new science wet labs, Southwest, 2012, San Diego, SDVS, Genomics, UC San Diego, LEED, Biotechnology Vendor Showcase Event, 2011